+20 Chlorine Scrubber Design Calculation References

Best Design Tips and References website. Search and Download anything about Design Ideas in this website.

Chlorine Scrubber Design Calculation. Calculation ln hetp = 0.8374366 hetp = 2.3104368ft = 0.7042211m for separations, less than 15 theoritical stages, a 20% design safety factor can be applied. The scrubber is a packed tower with intalox.

ASME Power & Process Piping Havlovick Engineering Services, Inc
ASME Power & Process Piping Havlovick Engineering Services, Inc from hes1.com

Molar flow rate = 0.0094 kmol/sec, 2. Selectivity calculations are fundamental to the success of the treating process and to. The scrubber is a packed tower with intalox.

ASME Power & Process Piping Havlovick Engineering Services, Inc

The feed stream for the second scrubber has a flow rate of 278.397 kg/hr with 82.2% hcl concentration. The successful design and operation of wet scrubbers depends on knowing the size, composition, and derivation of the particles to be collected. The optimum wet scrubber system has such design goals as maximum particulate collection, low power consumption, and low maintenance. Not suited if solid particles are present in the air since the fiber mats may plug.